Construction Scheduling: Preparation, Liability And Claims
SKU: SONG0735529949
ISBN : 9780735529946
Availability: Only 5 Left In-stock.
Domestic Shipping: $3.99
Internation Shipping (Except United states): $16
Shipping & Tax will be calculated at Checkout.
Estimated delivery time 7-14 days.
International delivery time 2 to 4 weeks.
Construction Scheduling: Preparation, Liability and Claims
Construction Scheduling: Preparation, Liability, and Claims, Second Edition, helps today’s attorneys and construction professionals identify and analyze liabilities and potential contributing causes of delay or schedule disruptions, and prepare for a successful scheduling claim or defense. Comprehensive in scope, yet highly practical in approach, the text goes beyond instruction on CPM methods to help you demonstrate the consequences of delays, the costs of acceleration, and the ramifications of undelivered owner and builder commitments. It thoroughly examines all contractor and owner concerns about construction scheduling and claims preparation or defense, complete with discussions of pertinent case law, precedents, and implications. In one, accessible and comprehensive volume, our experts reveal their best strategies to: From the creation of the schedule to the successful conclusion of the project, Construction Scheduling: Preparation, Liability, and Claims, Second Edition provides the most complete and practical resource on the major elements of the construction scheduling life cycle you’ll find anywhere.
Specification of Construction Scheduling: Preparation, Liability and Claims
GENERAL | |
---|---|
Author | Esq., Jon M. Wickwire |
Binding | Hardcover |
Language | English |
Edition | 2 |
ISBN-10 | 0735529949 |
ISBN-13 | 9780735529946 |
Publisher | Aspen Publishers |
Publication Year | 2002 |
DIMENSIONS | |
---|---|
Height | 7.25 inch. |
Length | 2.25 inch. |
Width | 10.25 inch. |
Weight | 4.94 pounds. |
Write a review
Your Name:
Your Email:
Your Review:
Note: HTML is not translated!
Rating: Bad Good
Enter the code in the box below: