Practice Standard For Work Breakdown Structures

32.98 New In stock
Publisher: Prentice Hall College Div
SKU: DADAX1933890134
ISBN : 9781933890135
Availability: Only 5 Left In-stock.

Price:
$32.98

Domestic Shipping:$3.99
Qty: - +
   - OR -   

Practice Standard for Work Breakdown Structures

The Practice Standard for Work Breakdown Structures-Second Edition supplies project managers and team members with direction for the preliminary development and the implementation of the WBS. Consistent with A Guide to the Project Management Body of Knowledge (PMBOK® Guide)-Third Edition, the WBS Practice Standard presents a standard application of the WBS as a project management tool. Throughout the book, the reader will learn what characteristics constitute a high-quality WBS and discover the substantial benefits of using the WBS in every-day, real-life situations.

Specifications of Practice Standard for Work Breakdown Structures

GENERAL
AuthorProject Management Institute
BindingPaperback
LanguageEnglish
Edition2
ISBN-101933890134
ISBN-139781933890135
PublisherProject Management Institute
Number Of Pages111
Publication Date2013-08-01
DIMENSIONS
Height10.96 inch.
Length8.48 inch.
Width0.34 inch.
Weight0.93 pounds.

Write a review


Your Name:


Your Email:


Your Review:

Note: HTML is not translated!

Rating: Bad           Good

Enter the code in the box below: