Title
Modern Construction: Lean Project Delivery and Integrated Practices (Industrial Innovation),Used
Sold by Ergodebooks, an authorized reseller.
Returns accepted within 30 days | support@ergodebooks.com
Shipping Information
- Free Standard Shipping — United States only
- Processing Time: 1–3 business days
- Estimated Delivery: 3–5 business days after dispatch
- Double-boxed, fully insured & discreetly packaged
- Tracking number sent via email once dispatched
- Orders over $250 require signature upon delivery. Taxes calculated at checkout.
Returns & Refund
Returns accepted within 30 days of delivery.
Damaged or Defective Item
Free return shipping + replacement or full refund
Wrong Item Received
Free return shipping + replacement or full refund
Change of Mind
Return shipping at customer's expense · 25% restocking fee applies
During the past several decades, the manufacturing and service industries significantly increased their levels of productivity, quality, and profitability through the application of process improvement techniques and information technology. Unfortunately, the construction industry lags far behind in the application of performance improvement and optimization techniques, as well as its overall competitiveness. Written by Lincoln H. Forbes and Syed M. Ahmed, both highly regarded for leadership and innovation, Modern Construction: Lean Project Delivery and Integrated Practices offers cuttingedge lean tools and other productive strategies for the management of people and processes in the construction industry.Drs. Forbes and Ahmed focus mainly on lean construction methodologies, such as The Last Planner(R) System, The Lean Project Delivery System (TM), and Integrated Project Delivery(TM). The tools and strategies offered draw on the success of the worldrenowned Toyota Production System (TPS) adapted to the construction environment by construction professionals and researchers involved in developing and advocating lean construction methods. The book also discusses why true lean construction can best occur when all the construction stakeholders, owners, designers, constructors, and material suppliers are committed to the concept of optimizing the flow of activities holistically while deemphasizing their selfinterest.The authors also reintroduce process improvement approaches such as TQM and Six Sigma as a foundation for the adoption of lean methodologies, and demonstrate how these methods can improve projects in a socalled traditional environment. The book integrates these methods with emerging interest in 'green construction' and the use of information technology and Building Information Modeling (BIM), while recognizing the human element in relation to motivation, safety, and environmental stresses. Written specifically for professionals in an industry that desperately needs to play catch up, the book delineates cuttingedge approaches with the benefit of successful cases and explains how their deployment can improve construction performance and competitiveness.
⚠️ WARNING (California Proposition 65):
This product may contain chemicals known to the State of California to cause cancer, birth defects, or other reproductive harm.
For more information, please visit www.P65Warnings.ca.gov.
- Q: What is the primary focus of 'Modern Construction: Lean Project Delivery and Integrated Practices'? A: The book primarily focuses on lean construction methodologies, including The Last Planner System and Integrated Project Delivery, aiming to improve efficiency and competitiveness in the construction industry.
- Q: Who are the authors of this book? A: The authors are Lincoln H. Forbes and Syed M. Ahmed, both recognized for their contributions to leadership and innovation in construction management.
- Q: What topics are covered in this book? A: The book covers lean construction techniques, process improvement methods like TQM and Six Sigma, and integrates concepts of green construction and Building Information Modeling.
- Q: Is this book suitable for beginners in construction management? A: While the book is written for professionals, it provides foundational knowledge of lean methodologies that can benefit both beginners and experienced practitioners in construction management.
- Q: How many pages does the book have? A: The book contains 524 pages, providing comprehensive coverage of its topics.
- Q: What is the binding type of this book? A: The book is available in hardcover binding, which is durable and suitable for frequent reference.
- Q: What edition is 'Modern Construction: Lean Project Delivery and Integrated Practices'? A: This book is published as the first edition.
- Q: When was this book published? A: The book was published on October 13, 2010.
- Q: Does the book include case studies or real-world examples? A: Yes, the book includes successful case studies and examples that illustrate the deployment of lean construction techniques.
- Q: Can this book help improve project performance in traditional construction environments? A: Yes, the authors demonstrate how lean methodologies can enhance project performance even in traditional construction settings.