Title
The IEA/SSPS Solar Thermal Power Plants: Facts and Figures Final Report of the International Test and Evaluation Team (ITET),Used
Sold by Ergodebooks, an authorized reseller.
Returns accepted within 30 days | support@ergodebooks.com
Shipping Information
- Free Standard Shipping — United States only
- Processing Time: 1–3 business days
- Estimated Delivery: 3–5 business days after dispatch
- Double-boxed, fully insured & discreetly packaged
- Tracking number sent via email once dispatched
- Orders over $250 require signature upon delivery. Taxes calculated at checkout.
Returns & Refund
Returns accepted within 30 days of delivery.
Damaged or Defective Item
Free return shipping + replacement or full refund
Wrong Item Received
Free return shipping + replacement or full refund
Change of Mind
Return shipping at customer's expense · 25% restocking fee applies
The Project's origin As a consequence of the socalled "first oil crisis", the interest in solar electricity generation rose sharply after 1973. The solar ther mal way of solving the problem was attractive because the main task was simply to replace the fossil fuel by a "solar fuel" in an other power plant that was at least what many wise conventional thermal thought at that time. Thus more than half a dozen of solar thermal plant projects were created in the midseventies. One of them is the Small Solar Power Systems (SSPS) Project of the International Energy Agency (lEA). It consists of the design, development, construction, operation, test and evaluation of two dissimilar small solar thermal electric power systems each at a nominal power of 500 kW . e ITET and TOAB In order to assist the Operating Agent (DFVLR Deutsche Forschungs und Versuchsanstalt fUr Luft und Raumfahrt e. V. ) in managing the project, the Executive Committee (EC) created two bodies called the "International Test and Evaluation Team" (ITET) and the "Test and Operation Advisory Board" (TOAB). The latter consisted of a group of experts from the different participating countries, meeting three to four times a year to articulate i. a. the technical interests and expectations of the different parties in the project. It was the TOAB that formulated e. g.
⚠️ WARNING (California Proposition 65):
This product may contain chemicals known to the State of California to cause cancer, birth defects, or other reproductive harm.
For more information, please visit www.P65Warnings.ca.gov.